Pole120
Addicted CEG'er
A very small taste of what PRT’s been up to this winter.
Ported LIM:
Butterflies and shafts removed.
Shaft holes filled and smoothed
Injector ports opened up
Custom fabbed IMRC linkage made from modified stock linkage and some hardware store goodies
Alignment pins were also made for proper alignment of UIM and LIM at install
Max honed UIM:
Top: As recievedf rom EH
Bottom: Final hand port work complted
73mm Inlet as revieved form EH. I’m having an aluminum adapter plate machined at the moment to transition from my 65mm TB to this inlet diameter for minimal turbulance(pics to follow)
Theres a lot more to show, but some things must wait untill the propper time....
Ported LIM:
Butterflies and shafts removed.
Shaft holes filled and smoothed
Injector ports opened up
Custom fabbed IMRC linkage made from modified stock linkage and some hardware store goodies
Alignment pins were also made for proper alignment of UIM and LIM at install
Max honed UIM:
Top: As recievedf rom EH
Bottom: Final hand port work complted
73mm Inlet as revieved form EH. I’m having an aluminum adapter plate machined at the moment to transition from my 65mm TB to this inlet diameter for minimal turbulance(pics to follow)
Theres a lot more to show, but some things must wait untill the propper time....