Bugzuki
Veteran CEG'er
Finally got the hoist up a couple months ago. Shop is slowly moving forward. I guess I got the doors on now too. Started painting.
Now I need to get the electrical permit so I can get some power out the besides the extension cords.
Obviously I still have a couple spots to finish on the siding. First things first though.
http://www.hybridaction.com/Paul_CSVT/1998_Ford_Contour_SVT.htm
Now I need to get the electrical permit so I can get some power out the besides the extension cords.
Obviously I still have a couple spots to finish on the siding. First things first though.
http://www.hybridaction.com/Paul_CSVT/1998_Ford_Contour_SVT.htm