Originally posted by EternalOne:
I have all of the materials sourced already, and everything else will be done in-house. Pat (the engineer who I'm working with on this) has recommended a heat-treating, as well, and that can also be done in-house, along with all of the bending, closing and welding the ends (to prevent internal rot), and powdercoating. The only thing I have lef to find is bushings, but that shouldn't be much of a problem. Right now I'm only making 2 bars, one for my car, and one for someone else (Rick has expressed interest in testing all of my new products, so it most likely will go to him to test along with the motor/tranny mounts, etc.)

I'll keep everyone updated, in case ATI cannot come thru. The shop has said it'd take no more than a week in production to complete 100 bars.

E1





YOu should start your own gb thread on this.


I reject your reality and substitute my own.