|
|
Joined: May 2003
Posts: 5,621
Hard-core CEG'er
|
Hard-core CEG'er
Joined: May 2003
Posts: 5,621 |
Originally posted by RoadRunner: Originally posted by Shaggy: Its a 2 hour job on a lift, I hope you're not going to try this on the floor.
Ouch, I were gonna replace mine on Zetec, but to take outer axle out? (RoadRunner - yours was replaced by AAA shop by the Lincoln Tunnel )
|
|
|
|
|
|