I consider myself to be very mechinacally inclined having worked on cars for about 25 years.

The only trouble I had with the UIM/LIM rebuild was the fuel injector installation. You will need new o-rings for sure. Everything must be meticulously clean and lubricated properly prior to a very careful injector reinstallation.

If the injecotrs are not touched, the job is a piece of cake.


1998 Mystique LS 2.5l Duratec Willow Frost