I am still going to have to say that its real. Took the pic by 4 architects and 2 contractors yesterday while I was up at studio and they all agreed that while poorly designed, that stuff happens. First, about the grade height from the street. Yes there is code but it often varies and can be quite high for area that have excessive rainfall. About the fill undeneath the far driveway. Everyone I showed it too said it just looked like dead grass. About the bottom width. Code in most stated say that the minimum base width is 8 feet, that appears wider than 8 feet. About the drain 2+ feet above the ground. Simply poor coordination between subcontractors. Finally about the "lack" of an exit. All concrete on a project is not poured at the exact same moment. They probably underestimated the need and had to put it off a day or two. Sorry, but it is real.