Yeah I installed mine in about 1 month, but that was with pulling the tranny and getting a Quaife and Zetec final drive installed too. Also I installed GC's on my Konis and added SS brake lines.
You could do it in a week easy, just working on it every night.
PS At 10psi my car is like a frikkin slinghsot.