id say about 2-3 hrs of work....mostly becasue of stubborn bolts. its not too much work if u are at a shop at all....u have 2 bolts to drop the y-pipe and then about 13 other bolts....thats it.
Jiako 1998 Silver SVT
3L power
212.5 HP 191.2 TQ
14.53 @ 95.6 MPH