I get you now buddy . yeah I have everything figured out but for the most part Im not going to write about my future plans when I ahvent done them yet. Im gonig to have my 3L heads matted to my LIM form my 2.5L svt intake and teh Port and Polished. Im sending the exhaust maniolf and upper intake manifolds to Exctrude hone for Port and polishing and im gonig to wait untill they get back I wont have a car for that tiem so ill be working on the basic 3L block grinding the crank and prepping it for when the parts come back also Im ordering the gaskets and other things at the same time. while I wait. umm ofr now thast all. peace out
99 T-RED SVT 50,555 Miles and counting as off 7/12/2002 born jan 99 UR underdrive pulley A Pillar Guages w/ AIR/FUEL VOLTS OIL PRESSURE "how to" members.aol.com/samplewon/apillarguageinstall.jpg B&M short throw shifter Eibach Springs BAT Sturts White Faced HVAC 2 ALPINE TYPE R 12" and ALPINE 1507 V12 AMP Cup Holder Upgrade PIAA super white Lows Whelen 90watt 6 bulb strobe kit Front end motor mounts
Mods waiting for install 3L(job has alrady begun, 3L totaly stripped.) Quaife LSD Apexi s-afc Mirko splitter
|