Once again I thank all of you guys for egging me on and I am working on it little by little each day so hopeflly in 2 minths i will have it completed. I am giving such a long end date becuase of a shortage of funds I have. When I recieve funds I will be sending the LIM and 3L heads to jiako so his mechaninc can do the matting and change all the necessary things that he did in order to have a smooth burn. Then after I get it back from him In sending the heads to extrude hone for I have a buddy that is getting me a great deal for P&P. after that I dont have planned yet..
I need some designs on the modded fuel rain and specs so I can start getting an idea as to how i am gonig to put it together. as for everything else Ill ask if i need help
peace for now.
sam


99 T-RED SVT
50,555 Miles and counting as off 7/12/2002
born jan 99
UR underdrive pulley
A Pillar Guages w/ AIR/FUEL VOLTS OIL PRESSURE "how to" members.aol.com/samplewon/apillarguageinstall.jpg
B&M short throw shifter
Eibach Springs
BAT Sturts
White Faced HVAC
2 ALPINE TYPE R 12" and ALPINE 1507 V12 AMP
Cup Holder Upgrade
PIAA super white Lows
Whelen 90watt 6 bulb strobe kit
Front end motor mounts

Mods waiting for install
3L(job has alrady begun, 3L totaly stripped.)
Quaife LSD
Apexi s-afc
Mirko splitter