It says production began then at the Mexico plant. It doesn't say when kansas city production began. Tempos/topazs were done being built on may 20th 2004, so some time after that production of contours began there.


98.5 SVT 91 Escort GT (almost sold) 96 ATX Zetec (i brake to watch you swerve) FS: SVT rear sway bar WTB: Very cheap beater CEG Dragon Run - October 13-15