Originally posted by Swazo:
What's the deadline for the deposit? If we've got a month or so, I'd be in for sure.




By the time they get a lip spoiler and the molds made it should be a month at least.


-'96 SE MTX 3L -'98 SVT 1,173 of 6,535 -'05 Mazda 6s, loaded, g/f's ride -Need a 96-00 manual on CD? PM or email me