Check the leads going from the terminals to the point where they most like enter the spider (haven't looked at a tempest in years) Measure across the leads of the VCs to make sure the resistance is still near published specs.

Sorry to hear about the issues.


"If you are flammable and have legs, you are never blocking a fire exit" -Mitch Hedberg