Quote:
Originally posted by rainshdw:
So I apply 5, wait 24 then apply 6, wait 24 hrs then apply 5, wait 24 hours, then apply 6...ect??

I'm asking if I have to wait 24 hours every time I apply 6 too??


Opps, I meant Z2 there. I fixed my post.

No. Z6 has no time limits. Can be done 30 seconds after Z5/Z2 or 30 seconds before before. Just 24h between Z5/Z2 coats, even though you are applying something in between. You just may have to wait quite some time to let the Z2 or Z5 dry before removing it. Low temperatures and higher humidity lengthen the drying time.