Originally posted by wa2tuff:
Originally posted by mygameisplatnum:
it gives more options to make the parts match. I wanted this so I can pick which color looks best. You never can be too sure how good the colors will come out w/ these things. Also w/ the 6 color inverter I only have to use 1 inverter to run all the gauges, the HVAC and the HL ( via the 2 y-splitters the lady is throwing in for me). they will all be color controlled simultanueously aka all 3 pieces will change at the same time and match perfectly.




I just got mine yesterday. Haven't had time to do anything yet. I have one inverter for each piece. If you can use y-splitters for these things, why would they go to the extra expense of including inverters for each piece. Any chance of overloading the inverters by putting more than 2 or more pieces on it?




I think your confusing the y-splitters w/ inverters. The gauges have 4 plugs (which takes up the entire inverter..b/c it only has 4 openeings), in order to get the HVAC and HL to work you need to have 2 y-splitters to branch off from the 1 inverter running your gauges (1 y-splitter for the HVAC and 1 y-splitter for the HL which will essentially give you 6 openings instead of 4 to hold all 6 plugs from all the parts)thats why i said i think you are confusing the 2. Unless you have 3 pieces that all have a switch to change the colors. I havent seen them yet since I ordered them a few days ago but thats the logic behind it. Either way I spoke w/ the co. and im sure their sending me what I need to make it work.


Justin 98.5 CSVT # 4887 of 6535 (born 2/28/98)