The bars will begin to be available 90 days after recipt of orders. It will take the mill 60 days just to get the material to the fabrication shop. With travel time from the fabrication shop to the heat treaters and then to the coating facility 90 days will be optimistic. But I could start to see bars about that time frame.
I will look into hardware. That should not be as tough to obtain as the steel. If the interest is still there I'll see if I can include the hardware, but at a minimum that would push the price from $190 to about $200 at the group buy level, probably not affecting the retail cost of $255.
Maxwell Church
Nemo Malus Felix
ATI Performance Engineering
47199 Cartier Drive
Wixom MI 48393
248*848*9200 ext 131
248*894*2219 direct