Originally posted by gearhead98:
Originally posted by Dakmis:
wish me luck, its my turn to have a go at this




ditto will be removing it to have it tested in about 5 hours
then i will be rerunning the wires between it and the batt.




DONE!

after i got off my butt it only took about 3 hours to do everything.

longest part was running my dead alt to napa to trade them for the new one.


98 contour svt #6473 of 6535