Originally posted by gearhead98: Originally posted by Dakmis: wish me luck, its my turn to have a go at this
ditto will be removing it to have it tested in about 5 hours
then i will be rerunning the wires between it and the batt.
DONE!
after i got off my butt it only took about 3 hours to do everything.
longest part was running my dead alt to napa to trade them for the new one.
98 contour svt
#6473 of 6535
|