Originally posted by I Heart SVT:
How long does the whole process take?




About a year. Let it dry over night to make sure it's dry before oiling.


-'96 SE MTX 3L -'98 SVT 1,173 of 6,535 -'05 Mazda 6s, loaded, g/f's ride -Need a 96-00 manual on CD? PM or email me