Originally posted by I Heart SVT: How long does the whole process take?
About a year. Let it dry over night to make sure it's dry before oiling.
-'96 SE MTX 3L
-'98 SVT 1,173 of 6,535
-'05 Mazda 6s, loaded, g/f's ride
-Need a 96-00 manual on CD? PM or email me
|