well the main problem is the gutted pre cats, even with the mil's it would fail because the dot computer in albany would think that the cats arent working properly, since theres no fluctuation(sp) as far as codes i get a mass air metering code and bank one and two low voltage codes


"Youth ages, immaturity is outgrown, ignorance can be educated, and drunkenness sobered, but STUPID lasts forever."-Aristophanes. --93 pgt,headers,intake,borla=14.9 1/4mile