Hey Warmonger, I wish you and I had of exchanged this info. earlier. I removed the well plugs holding the spring loaded rubbing blocks, then drilled, reamed and tapped the wells for 5/16 plugs. I fooled around trying to get those damn things back down, but to no avail. Anyhow, I'm ready to put it all back together but wanted to take pics first.

Did your linkage line up? On mine the 2 shafts/plate assembly opened approx. 85 degrees and 95 degrees from horizontal. A little bending on the linkage and some grinding on the stop and I was able to get it all working properly so full open both sides are 90 degrees. That angle finder just paid for itself!

Yes, I have a prototype spacer/splitter made up. Soon as I borrow the digicam I'll post the pics.


Technical Director/Co-Owner Performance Fords-check out our new throttle body service
95 SE with lots of custom 1 off mods. All design, fabrication and installation by owner.