I read that you hope production could begin by Feb '01. If so, that'll give me something to look forward to all winter long. Get one of these installed for spring time in Michigan smile.

Oh yeah, I posted a link to this thread over at SVTOA.com in the Contour section. But I think everyone who reads that section probably reads this board as well.


'99 Black SVT
Join the SVTOA
Safe Harbour Statement:
Anything said above must be interpreted against the background that nothing whatever might occur in the future.