Since the SVT is no longer my DD I can finally get to some much needed TLC and what not... I figured I would start with cleaning the UIM and LIM (plus new gaskets) along with valve cover gaskets while I wait for my BAT y-pipe from CTA.
@ 258K KMS, this is how the UIM and LIM looked...
Before - UIM
After - UIM (not 100% complete)
Before - LIM (on the block)
Still need to purge the fuel lines and pull the LIM for cleaning... Next thing from there will be the valve cover gaskets, as you can see from the pics, they need it! From there it's the BAT y-pipe and gutted manifolds then into the interior to remove the back seats and clean up the carpet.
@ 258K KMS, this is how the UIM and LIM looked...
Before - UIM

After - UIM (not 100% complete)

Before - LIM (on the block)

Still need to purge the fuel lines and pull the LIM for cleaning... Next thing from there will be the valve cover gaskets, as you can see from the pics, they need it! From there it's the BAT y-pipe and gutted manifolds then into the interior to remove the back seats and clean up the carpet.