Pole120
Addicted CEG'er
With 11 days to go the SVT build for SZ has begun...
Crossed off the list today is the re-working of the Exhaust. I cut the old system up and built a new one today(pics to follow next week when i have it off). I replaced the main cat with a Magnaflow high flow unit and eliminated over 360* of bends, there is a noticeable difference, when coupled with the other items to follow it should really open things up.
Still on the list for today is to get the 65mm TB built and start the adapter plate as well as working on building my new intake tube.
I've got a long way to go yet...hope the car gets done in time. :crosses fingers:
Crossed off the list today is the re-working of the Exhaust. I cut the old system up and built a new one today(pics to follow next week when i have it off). I replaced the main cat with a Magnaflow high flow unit and eliminated over 360* of bends, there is a noticeable difference, when coupled with the other items to follow it should really open things up.
Still on the list for today is to get the 65mm TB built and start the adapter plate as well as working on building my new intake tube.
I've got a long way to go yet...hope the car gets done in time. :crosses fingers:
Last edited: